Manufacturing plants, fabrication shops and crane-ready buildings, laid out around your process and engineered for the loads it puts on the structure.
Platinum Buildings designs and supplies pre-engineered steel buildings for industrial clients across Canada. Our clients include manufacturers, steel fabricators and welding shops, heavy equipment and fleet operators, and businesses that serve the resource sectors.
An industrial building isn’t just a shell. It holds a process: material comes in, work gets done, product goes out. Cranes, machines, mezzanines and trucks all place demands on the structure.
A pre-engineered steel building handles that well when it’s planned around the work. Our team has spent most of its time in manufacturing, so we think about how the floor will actually be used.
Interior columns that don’t suit the layout get in the way of machines, cranes and traffic for the life of the building.
A crane added later can mean reinforcing frames and foundations. Planning it from the start is far simpler.
Production can’t wait. The building has to be designed, approved and delivered in a sequence that works.
A building that fits today can feel small in a few years. Expansion is easier when it’s planned at the start.
Industrial buildings range from a single fabrication bay to a large multi-bay plant. Sizes in our quotes are written as width × length, for example 40′ × 60′.
Production space laid out around your process, often with offices, washrooms and storage built in. Column spacing is planned around equipment and material flow.
High-eave buildings with wide doors, crane-ready frames and room for fume extraction. Built for steel coming in one end and finished work going out the other.
Buildings designed from the start for bridge cranes, underhung cranes or monorails, with the runway and loads built into the frame design.
Drive-through bays for trucks and heavy equipment, with large overhead doors, pits or hoists, and heated work areas.
Covered storage for materials, parts and finished goods, often attached to a production building. Racking and forklift traffic shape the layout.
Clear span means no interior columns. It suits buildings with cranes and moving equipment. A multi-span building uses interior columns and can lower the cost of very wide buildings. We place columns where your process can live with them.
A crane adds heavy, moving loads to the frames. The design needs the crane’s capacity, span, hook height, type and how often it runs. Bridge cranes, underhung cranes and monorails each load the building differently.
Mezzanines add floor area for storage, offices or equipment without a larger footprint. Their loads, stairs and access are designed into the structure from the start.
Bay spacing is the distance between main frames. It affects where doors can go, how cranes run and how much the building costs. Wider bays give more open wall space, but each frame carries more load.
Eave height is the height of the wall where it meets the roof. For crane buildings, it’s set by the hook height you need plus the crane’s own size. For storage, it’s set by racking height.
Overhead doors for trucks, man doors for safe exits and openings for equipment all need framing designed around them. Plan large doors early, while the frame layout is still flexible.
Sprinklers, lighting, ducts and heaters hanging from the roof add weight. These are called collateral loads. They need to be included in the design so the roof is sized for them.
If you expect to expand, an endwall can be designed so the building can be lengthened later. Future crane runways can be planned in at the same time.
Every industrial project follows the same six steps. Here’s what we pay extra attention to on industrial work.
We start with your process: what comes in, what happens inside, and what goes out.
Crane, mezzanine and collateral loads are confirmed before the frames are designed.
We prepare drawings to support your permit application.
Components are fabricated to the approved drawings, checked with crane runways and connections in mind.
Loads are planned around the erection sequence and your site.
We stay available to your erector and site team while the building goes up.
Read the full step-by-step process, or see what goes into design and engineering.
You don’t need every answer before you request a quote. But thinking these through first makes the conversation faster and the quote more accurate.
Process drawings, equipment lists and a site plan all help. Send what you have with your quote request.
Yes, when it’s designed for one from the start. The frames, columns and runway beams are sized for the crane’s capacity, span and type. Tell us the capacity, span, hook height and how often the crane will run, and we’ll include it in the design.
Only if the building was designed for it. Adding a crane to a building that wasn’t usually means reinforcing the frames and foundations, which is costly. If a crane is likely in the next few years, plan for it now.
A clear-span building has no interior columns, so the whole floor is open. A multi-span building uses interior columns to support the roof, which can lower the cost of very wide buildings. The right choice depends on how you use the floor.
Yes. Mezzanines and office areas are designed into the structure, with the loads they carry. Tell us what the mezzanine is for, such as storage, equipment or offices, so it’s sized correctly.
The size, location and use of the building, plus any cranes, mezzanines or heavy equipment. Door sizes, eave height and insulation needs help too. Drawings or a site plan make the quote more accurate.
It depends on size, loads, cranes, mezzanines, doors, insulation and scope. Crane and mezzanine loads in particular affect the frame design. Send us the details and we’ll quote your building.